Thats right.. (nearly) everything has been done, but still no kitchen sink..
Here are a few pics from tonight's visit... excuse the quality as it was almost dark, and we are still locked out, which I am sure we will be now until hand over.. (which cant be far away!!)
Our chinaman hats and light bulbs installed.. Wonder where the 40% energy saver bulbs are..
Yayyyyy!! Our oven and rangehood are installed.. It looks like the oven can still be pushed back a little more so it wont stick out as far.. (no they aren't ghosts, they are the flash bouncing off the windows lol)
There is not much left to do now...
Things that still need to be done:
BEFORE HANDOVER
Toilets
Insulation
Air conditioner
Kitchen sink and tap
Electricity and pump on water tank, and HSTP
Tap to fridge area
Clean house
AFTER HANDOVER
Tiling by DH
Carpets by BIL
Tv aerial
Clothesline
Decking to alfresco and patio
-Sha