Well, after all of our running around and never really knowing what we were doing, lol, we have gone back to our original decision. We signed a Preliminary Assessment with Newstart Homes, which will get us all of the tests/plans required for council etc.. We would love to have built the house below (our dream home!), but in today's market, we felt it would have been stepping too far above our comfort level.. We decided the termite problem was fine (after researching some more) as long as we have Kordon treatment. Bayer warranty it for 50 years, and our house will be under warranty for defects from Newstart for LIFE! - whilst we are the owners. If we sell the house, it reverts back to the original 30 year warranty for the new owners.. So we don't feel we are taking too much of a risk :) We have a few things to iron out before contract, so hopefully things will all go to plan.
Above is our slightly reworked plan and the original elevation...
02/04/09 - oven and rangehood, lights, power points, door handles, gas connection, telstra connection and air conditioner power switch all installed within the past two days. painting compete.
31/03/09 - shower screens, wardrobe doors, shelving, and some of the taps installed. Oven arrives but not yet installed. Painting still not complete. Interior doors hung.
27/03/09 - Ceasarstone installed in past week. Garage door installed today. Painting almost complete.
17/03/09 - tiling complete a few days ago ( cant remember exact date now). Painting started. Ceiling complete. First coat is on walls -not cut in yet.
05/03/09 - Skirting, architraves door jams and internal doors installed. Front door installed. Tiling started.
26/02/09 - Waterproofing done to all wet areas. Doors, architraves and skirting arrive on site, including front door.
24/02/09 - Soffit finished (all but a small section above the garage), blueboard above windows finished. Temporary front door installed. 'Enclosed stage' complete (except small section of blueboard near garage, and issues with roof)
18/02/09 - Plastering complete. Cornice installed, Energex hooks up electricity to house. Solar panels for hot water are on roof.
12/02/09 - Walls plastered, downpipes installed, more bricking done
09/02/09 - Plasterboards installed to ceiling, Energex installed power to our pole
05/02/09 - Plumbing installed inside and out.
04/02/09 - Bricks started, roof complete (but sarking still to be fixed)
02/02/09 - wiring installed, house wrapped
30/01/09 - Bricks delivered
29/01/09 - Roof started, windows and doors installed
27/01/09 - Framing stage complete. Windows delivered
20/01/09 - We have been Framed!
16/01/09 - We have a slab! Wall frames delivered
15/01/09 - Slab prepared, roof trusses delivered
13/01/09 - Plumbing pipes installed
08/01/09 - Site scrape completed
17/12/08 - driveway installed (crushed sandstone)
05/01/09 - our second attempt at starting site scrape
12/12/08 - our power pole installed
09/12/08 - poly water tank Installed
05/12/08 - Our first day of Construction!!! woohooo!!!!!!! *edit* - not much happened cause the excavator got stuck in the mud. Its been raining heaps and very muddy onsite.
29/11/08 - Balance of second deposit paid today. Everything is now in place. Just need to hand our file to our SS who's name we now know .."M" will do for here..and he will now book in site excavations.
14/11/08 - Today we received our council approvals in the mail. (was actually approved yesterday according to the paperwork and council website). Also received a copy of the BSA insurance and more documents to sign for the bank.
11/11/08 - Received the registration certificate in the mail to say the land was now in both our names
16/10/08 - Finally we have full approval from the bank yayyyyyy!! Now all we need is council approval and we are good to go..
22/09/08 - Signed contracts!! over a glass of red and a beer for Tim
19/09/08 - Received Contracts x 3 in the mail, changed colours in kitchen and ensuite
15/09/08 - Footing Design came back to the builder today. Should have contract this week
05/09/08 - Conditional Approval granted from bank :). Final colour selections completed.
04/09/08 - Second deposit paid
15/08/08 - Soil test came back - Highly reactive soil (H)!!.. and a P (problem) site due to trees.
Disclaimer - This blog is our way of sharing our story. It is intended for our family and friends and any others whom may be interested in reading.Company names are mentioned with the intent to tell our experiences. If you believe that any statements made are in any way defamatory slanderous, hateful, obscene, or vulgar, please contact us to allow the item in question to be edited or removed from this blog.